Front step landing sunken and the first step riser being too high and over the Ontario Building Code requirement of 8 inches. Driveway closest to the garage door has sunken due to the ground settling.

Each individual solution below has a cost estimate, choose only what you need. Call us today 416.804.1155 to enjoy the special deals while we are working in your neighborhood.

Step Landing Repair

Screenshot 2025-08-08 173338.png

Build a new landing to replace the existing one and ensure the first step is of proper height conforming to the Ontario Building Code.

Cost estimate: $488

Hybrid Driveway

img_3275.jpg

Install interlocking paving stones in front of the garage to address the drop caused by sunken asphalt. This will create a smooth entrance to the garage. The stones will extend on both sides of the driveway to the street.

Cost estimate: $2025 ($1025 without both sides)

Driveway Complete Revamp

f19164c96b05a1cf2407e5499b117820.jpg

This is the ultimate solution. Choose this solution only if you would like to replace the asphalt with interlocking paving stones.

1. Remove and dispose of existing asphalt

2. Top up existing foundation with aggregate

3. Lay paving stones (aka interlock) to finish the driveway

4. Fill with polymeric sand to prevent weeds from growing

Cost estimate: $6150