top of page
IMG_8720_edited.jpg

66 Sunrise Ridge

Front step landing sunken and the first step riser being too high and over the Ontario Building Code requirement of 8 inches. Driveway closest to the garage door has sunken due to the ground settling.

Each individual solution below has a cost estimate, choose only what you need. Call us today while we are working in your neighborhood to enjoy the special deals.

Step Landing Repair

IMG_8720_edited.jpg

Rebuild the landing and raise it to proper height in order to ensure the first step's riser is no more than 8", conforming to the Ontario Building Code.

Cost estimate: $563

Hybrid Driveway

img_3275.jpg

Install interlocking paving stones in front of the garage to address the drop caused by sunken asphalt. This will create a smooth entrance to the garage.

Cost estimate: $850

Driveway Complete Revamp

f19164c96b05a1cf2407e5499b117820.jpg

This is the ultimate solution. Choose this solution only if you would like to replace the asphalt with interlocking paving stones.

1. Remove and dispose of existing asphalt

2. Top up existing foundation with aggregate

3. Lay paving stones (aka interlock) to finish the driveway

4. Fill with polymeric sand to prevent weeds from growing

Cost estimate: $4037

Help me decide!

bottom of page